The design and construction process of electrical substations and very high voltage lines was carried out using poorly integrated tools, with a strong dependence on manual processes and a disconnect between phases of the asset lifecycle.
Proven delivery deploying BIM methodologies at great scale in the Utilities industry





Engineering Process Automation
Implemented tailored automation solutions to reduce repetitive technical tasks, accelerate design cycles, and improve accuracy through standardized digital workflows.
Standardized BIM Component Library
Developed a catalog of 2,800+ parametric, standardized BIM objects, enabling intelligent, reusable, and component-based design aligned with corporate standards.
Enterprise Systems Integration
Integrated BIM models with corporate platforms to ensure digital data continuity and enhance interoperability across systems and teams.
Capability Building & Performance Governance
Delivered structured training and change management programs, supported by BIM maturity KPIs to monitor adoption, performance, and continuous improvement.
The BIM methodology consulting and implementation project developed by NTT DATA, has enabled the complete digitization of the engineering and construction processes for substations and very high voltage lines.